FULTON STREET over M-9164 CENTRAL AVE.
IN ATLANTA · County 121, Georgia · Built 1988 · 5 Lanes · 9,910 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.741922, -84.393403
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
I-75 RMP TO FULTON over I-75 RMP SB FROM I-20N&S
Built 1988
FULTON STREET over I-75-3 I-75R-1 MRT-1 CS
Built 1988
I-75 N RM TO FULTO over I-75 NB RMP TO I-20 E&WB
Built 1988
I-75 RMP N TO M916 over I-75- I-75R- I-20R-M9163
Built 1988
WASHINGTON STREET over 2 I-75 RAMPS
Built 1959
I-20 RMP EB TO I-7 over I-75-3I-75R-I-20R-3MRT-2
Built 1988
I-20 RMP E TO I-75 over M-9163- M-9164- M-9166
Built 1987
I-20 WBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
I-75 SB RMP TO I-2 over I-75- 2 I-75 RMPS- I-20R
Built 1988
PRYOR ST TO I-75 S over I-75-I-75R-I-20R-M9163-9
Built 1988
Bridge Details
- Structure #
- 000000012106600
- Year Built
- 1988
- Length
- 23.5 m (77.1 ft)
- Max Span
- 23.5 m
- Width
- 26.9 m (88.3 ft)
- Lanes
- 5
- Daily Traffic
- 9,910
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $547,000
- Total Project Cost
- $821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.