FULTON STREET over M-9164 CENTRAL AVE.

IN ATLANTA · County 121, Georgia · Built 1988 · 5 Lanes · 9,910 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012106600
Year Built
1988
Length
23.5 m (77.1 ft)
Max Span
23.5 m
Width
26.9 m (88.3 ft)
Lanes
5
Daily Traffic
9,910
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$547,000
Total Project Cost
$821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.