I-20 WBL over 3I75RMP-2I20RMP-3MRT-2MR

I-20 =I-75 INTERCHANGE · County 121, Georgia · Built 1988 · 3 Lanes · 28,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106520
Year Built
1988
Length
546.8 m (1794 ft)
Max Span
68.6 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
28,700
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,921,000
Total Project Cost
$13,382,000