I-20- AND 2 RAMPS over M-9160 WINDSOR STREET
IN ATLANTA · County 121, Georgia · Built 1962 · 10 Lanes · 179,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.744942, -84.398078
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
I-20 RMP TO I-75 over I-20R(WINDSOR ST)TO I20E
Built 1989
WHITEHALL STREET over M-9073 SPRING STREET
Built 1963
I-20 RMP E TO I-75 over M-9163- M-9164- M-9166
Built 1987
I-20 WBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
I-75 RMP TO I-20WB over M9164 & RMP- M9166 & RMP
Built 1989
WASHINGTON STREET over 2 I-75 RAMPS
Built 1959
FULTON STREET over M-9164 CENTRAL AVE.
Built 1988
MCDANIEL STREET over I-20
Built 1988
SR 14 PETERS STRE over NS RAILROAD
Built 1935
MCDANIEL STREET over NS RAILROAD (718067U)
Built 1988
Bridge Details
- Structure #
- 000000012101810
- Year Built
- 1962
- Reconstructed
- 1987
- Length
- 67.7 m (222.1 ft)
- Max Span
- 17.7 m
- Width
- 60 m (196.9 ft)
- Lanes
- 10
- Daily Traffic
- 179,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,760,000
- Total Project Cost
- $4,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.