I-20 RMP E TO I-75 over M-9163- M-9164- M-9166
I-20 & I-75-85 INTER. · County 121, Georgia · Built 1987 · 1 Lanes · 6,805 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.744764, -84.394478
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 39 years old.
Nearby Bridges
I-20 WBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
WASHINGTON STREET over 2 I-75 RAMPS
Built 1959
I-75 RMP TO I-20WB over M9164 & RMP- M9166 & RMP
Built 1989
I-20 RMP TO I-75 over I-20R(WINDSOR ST)TO I20E
Built 1989
I-75 RMP N TO M916 over I-75- I-75R- I-20R-M9163
Built 1988
I-20 RMP EB TO I-7 over I-75-3I-75R-I-20R-3MRT-2
Built 1988
FULTON STREET over M-9164 CENTRAL AVE.
Built 1988
I-20- AND 2 RAMPS over M-9160 WINDSOR STREET
Built 1962
WHITEHALL STREET over M-9073 SPRING STREET
Built 1963
I-75 RMP TO FULTON over I-75 RMP SB FROM I-20N&S
Built 1988
Bridge Details
- Structure #
- 000000012106570
- Year Built
- 1987
- Length
- 215.8 m (708 ft)
- Max Span
- 44.5 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 6,805
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,012,000
- Total Project Cost
- $3,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.