WASHINGTON STREET over 2 I-75 RAMPS
IN ATLANTA · County 121, Georgia · Built 1959 · 4 Lanes · 19,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.744483, -84.392628
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 67 years old.
Nearby Bridges
I-75 RMP N TO M916 over I-75- I-75R- I-20R-M9163
Built 1988
I-20 RMP EB TO I-7 over I-75-3I-75R-I-20R-3MRT-2
Built 1988
I-20 RMP E TO I-75 over M-9163- M-9164- M-9166
Built 1987
I-75 RMP TO I-20WB over M9164 & RMP- M9166 & RMP
Built 1989
I-20 WBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
PRYOR ST TO I-75 S over I-75-I-75R-I-20R-M9163-9
Built 1988
I-75 SB RMP TO I-2 over I-75- 2 I-75 RMPS- I-20R
Built 1988
I-20 EBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
FULTON RM TO I-75 over I-75 NB RMP TO I-20 E&WB
Built 1988
I-75 N R TO I-20 W over I-75- 2 I-75 RMPS- I-20R
Built 1988
Bridge Details
- Structure #
- 000000012104160
- Year Built
- 1959
- Length
- 135.3 m (443.9 ft)
- Max Span
- 41.1 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 19,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,681,000
- Total Project Cost
- $4,022,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.