I-75 N R TO I-20 W over I-75- 2 I-75 RMPS- I-20R
I-20 & I-75 INTERCHANGE · County 121, Georgia · Built 1988 · 1 Lanes · 6,805 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.745147, -84.389728
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
FULTON RM TO I-75 over I-75 NB RMP TO I-20 E&WB
Built 1988
I-20R WB TO WINDSO over I-75-3I-75RMP-3I-20RMP-3
Built 1988
I-20 EBL over 3I75RMP-2I20RMP-3MRT-2MR
Built 1988
PRYOR ST TO I-75 S over I-75-I-75R-I-20R-M9163-9
Built 1988
I-75 SB RMP TO I-2 over I-75- 2 I-75 RMPS- I-20R
Built 1988
I-20 WB TO I-75 SB over I-75-3 I75 RMPS- I20 RMP
Built 1988
I-20 RMP EB TO I-7 over I-75-3I-75R-I-20R-3MRT-2
Built 1988
CAPITOL AVE. over I-20- I-75 RMP- I-20 RMP
Built 1988
I-75 RMP N TO M916 over I-75- I-75R- I-20R-M9163
Built 1988
WASHINGTON STREET over 2 I-75 RAMPS
Built 1959
Bridge Details
- Structure #
- 000000012107040
- Year Built
- 1988
- Length
- 171.9 m (564 ft)
- Max Span
- 70.7 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 6,805
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,603,000
- Total Project Cost
- $2,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.