I-75 over M-9053 GEORGIA AVE.

IN ATLANTA · County 121, Georgia · Built 1987 · 14 Lanes · 339,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106320
Year Built
1987
Length
58.5 m (191.9 ft)
Max Span
36.6 m
Width
69.9 m (229.3 ft)
Lanes
14
Daily Traffic
339,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,205,000
Total Project Cost
$4,808,000