HIRAM-LITHIA SPRIN over SWEETWATER CREEK
2.2 MILES WEST OF AUSTELL · County 067, Georgia · Built 2009 · 2 Lanes · 2,047 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.813683, -84.672492
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 17 years old.
Nearby Bridges
GARRETT ROAD over POWDER SPRINGS CREEK
Built 2009
WESTSIDE ROAD over SWEETWATER CREEK
Built 1979
US 278 / SR 6 over SWEETWATER CREEK
Built 1983
US 278 / SR 6 over POWDER SPRINGS CREEK
Built 1983
SR SPUR 6 over NS RAILROAD
Built 2000
HOLLOMAN ROAD over SWEETWATER CREEK
Built 1978
US 278 / SR 6 over NOR SOUTHERN RAILROAD
Built 1983
HOLLOMAN ROAD over SWEETWATER CREEK TRIB.
Built 2001
STOUT PARKWAY over GOTHARDS CREEK
Built 2014
AUSTEL POWDER SPGS over SWEETWATER CREEK
Built 1933
Bridge Details
- Structure #
- 000000006752840
- Year Built
- 2009
- Length
- 97.8 m (320.9 ft)
- Max Span
- 30.5 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,254,000
- Total Project Cost
- $1,881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.