US 278 / SR 6 over NOR SOUTHERN RAILROAD

1 MI SW OF AUSTELL · County 067, Georgia · Built 1983 · 5 Lanes · 37,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701920
Year Built
1983
Length
54.9 m (180.1 ft)
Max Span
18.3 m
Width
27.2 m (89.2 ft)
Lanes
5
Daily Traffic
37,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,279,000
Total Project Cost
$1,918,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.