US 278 / SR 6 over NOR SOUTHERN RAILROAD
1 MI SW OF AUSTELL · County 067, Georgia · Built 1983 · 5 Lanes · 37,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.805694, -84.652667
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 43 years old.
Nearby Bridges
US 278 / SR 6 over SWEETWATER CREEK
Built 1983
THORNTON ROAD over SWEETWATER CREEK
Built 1963
WESTSIDE ROAD over SWEETWATER CREEK
Built 1979
SR SPUR 6 over NS RAILROAD
Built 2000
AUSTEL POWDER SPGS over SWEETWATER CREEK
Built 1933
GARRETT ROAD over POWDER SPRINGS CREEK
Built 2009
HIRAM-LITHIA SPRIN over SWEETWATER CREEK
Built 2009
JEFFERSON ST CONN over SR 5 CS 340 RAILROAD
Built 1998
US 278 / SR 6 over POWDER SPRINGS CREEK
Built 1983
NORTH COUNTY LINE over BEAVER CREEK
Built 2007
Bridge Details
- Structure #
- 000000006701920
- Year Built
- 1983
- Length
- 54.9 m (180.1 ft)
- Max Span
- 18.3 m
- Width
- 27.2 m (89.2 ft)
- Lanes
- 5
- Daily Traffic
- 37,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,279,000
- Total Project Cost
- $1,918,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.