GARRETT ROAD over POWDER SPRINGS CREEK
NORTH OF AUSTELL CITY LIM · County 067, Georgia · Built 2009 · 2 Lanes · 2,047 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.821183, -84.661361
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 17 years old.
Nearby Bridges
WESTSIDE ROAD over SWEETWATER CREEK
Built 1979
US 278 / SR 6 over SWEETWATER CREEK
Built 1983
SR SPUR 6 over NS RAILROAD
Built 2000
US 278 / SR 6 over POWDER SPRINGS CREEK
Built 1983
HIRAM-LITHIA SPRIN over SWEETWATER CREEK
Built 2009
US 278 / SR 6 over NOR SOUTHERN RAILROAD
Built 1983
AUSTEL POWDER SPGS over SWEETWATER CREEK
Built 1933
CLAY ROAD over NOSES CREEK
Built 1995
OGLESBY ROAD over POWDER SPRINGS CREEK
Built 2008
OGLESBY ROAD over POWDER SPRINGS CREEK TR
Built 2008
Bridge Details
- Structure #
- 000000006752720
- Year Built
- 2009
- Length
- 47.2 m (154.9 ft)
- Max Span
- 22.9 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $606,000
- Total Project Cost
- $908,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.