US 278 / SR 6 over POWDER SPRINGS CREEK
2.4 MILES NORTH WEST OF A · County 067, Georgia · Built 1983 · 5 Lanes · 34,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.827925, -84.666867
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 43 years old.
Nearby Bridges
GARRETT ROAD over POWDER SPRINGS CREEK
Built 2009
WESTSIDE ROAD over SWEETWATER CREEK
Built 1979
SR SPUR 6 over NS RAILROAD
Built 2000
US 278 / SR 6 over SWEETWATER CREEK
Built 1983
HIRAM-LITHIA SPRIN over SWEETWATER CREEK
Built 2009
OGLESBY ROAD over POWDER SPRINGS CREEK
Built 2008
OGLESBY ROAD over POWDER SPRINGS CREEK TR
Built 2008
CLAY ROAD over NOSES CREEK
Built 1995
HOLLOMAN ROAD over SWEETWATER CREEK TRIB.
Built 2001
AUSTEL POWDER SPGS over SWEETWATER CREEK
Built 1933
Bridge Details
- Structure #
- 000000006701900
- Year Built
- 1983
- Length
- 81.1 m (266.1 ft)
- Max Span
- 11.6 m
- Width
- 26.4 m (86.6 ft)
- Lanes
- 5
- Daily Traffic
- 34,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,890,000
- Total Project Cost
- $2,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.