WESTSIDE ROAD over SWEETWATER CREEK

IN WEST AUSTELL · County 067, Georgia · Built 1979 · 2 Lanes · 480 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006751090
Year Built
1979
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
480
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.