WESTSIDE ROAD over SWEETWATER CREEK
IN WEST AUSTELL · County 067, Georgia · Built 1979 · 2 Lanes · 480 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.818397, -84.658789
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 47 years old.
Nearby Bridges
US 278 / SR 6 over SWEETWATER CREEK
Built 1983
GARRETT ROAD over POWDER SPRINGS CREEK
Built 2009
SR SPUR 6 over NS RAILROAD
Built 2000
US 278 / SR 6 over POWDER SPRINGS CREEK
Built 1983
HIRAM-LITHIA SPRIN over SWEETWATER CREEK
Built 2009
US 278 / SR 6 over NOR SOUTHERN RAILROAD
Built 1983
AUSTEL POWDER SPGS over SWEETWATER CREEK
Built 1933
CLAY ROAD over NOSES CREEK
Built 1995
JEFFERSON ST CONN over SR 5 CS 340 RAILROAD
Built 1998
THORNTON ROAD over SWEETWATER CREEK
Built 1963
Bridge Details
- Structure #
- 000000006751090
- Year Built
- 1979
- Length
- 48.8 m (160.1 ft)
- Max Span
- 12.2 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 480
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $625,000
- Total Project Cost
- $938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.