STOUT PARKWAY over GOTHARDS CREEK
3.7 MI W OF AUSTELL · County 067, Georgia · Built 2014 · 2 Lanes · 2,047 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.810661, -84.699142
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 12 years old.
Nearby Bridges
HOLLOMAN ROAD over SWEETWATER CREEK
Built 1978
HOLLOMAN ROAD over SWEETWATER CREEK TRIB.
Built 2001
BROWN ROAD over SWEETWATER CREEK
Built 1998
BURNT HICKORY ROAD over GOTHARDS CREEK
Built 1996
HIRAM-LITHIA SPRIN over SWEETWATER CREEK
Built 2009
BROWNSVILLE ROAD over SWEETWATER CREEK
Built 1998
BROWNSVILLE ROAD over SWEETWATER CREEK TRIB
Built 1960
PINE VALLEY ROAD over SWEETWATER CREEK
Built 1963
US 278 / SR 6 over POWDER SPRINGS CREEK
Built 1983
GARRETT ROAD over POWDER SPRINGS CREEK
Built 2009
Bridge Details
- Structure #
- 000000006753150
- Year Built
- 2014
- Length
- 27.4 m (89.9 ft)
- Max Span
- 12.2 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,992,000
- Total Project Cost
- $11,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.