POST ROAD over HATCHERS BRANCH
1 MI W OF FOLKSTON · County 049, Georgia · Built 1960 · 2 Lanes · 1,081 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.827011, -82.035722
This bridge is in worse condition than 35.2% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
CR 60 over HATCHERS BRANCH
Built 2021
SR 23 over CLAY BRANCH
Built 1952
POST ROAD over CLAY BRANCH
Built 1960
POST ROAD over SPANISH CREEK
Built 1960
OKEEFENOKEE PKWY over CLAY BRANCH
Built 2007
SR 23 over SPANISH CREEK
Built 1955
CR 45 over LONG BRANCH TRIB.
Built 1950
SPANISH CREEK RD over LONG BRANCH
Built 2019
US 1 / SR 4 over CLAY BRANCH
Built 1955
RALPH DAVIS ROAD over LONG BRANCH TRIB.
Built 2020
Bridge Details
- Structure #
- 000000004950570
- Year Built
- 1960
- Reconstructed
- 2006
- Length
- 24.4 m (80.1 ft)
- Max Span
- 6.1 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,081
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $313,000
- Total Project Cost
- $469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.