SR 23 over SPANISH CREEK
2 MI SW OF FOLKSTON · County 049, Georgia · Built 1955 · 2 Lanes · 2,840 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.803903, -82.027742
This bridge is in worse condition than 35.2% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 71 years old.
Nearby Bridges
SR 23 over CLAY BRANCH
Built 1952
POST ROAD over HATCHERS BRANCH
Built 1960
POST ROAD over CLAY BRANCH
Built 1960
CR 45 over LONG BRANCH TRIB.
Built 1950
POST ROAD over SPANISH CREEK
Built 1960
US 1 (SBL)/ SR 4 over LAKE DEBORAH TRIB.
Built 1954
CR 60 over HATCHERS BRANCH
Built 2021
US 1 (NBL)/ SR 4 over LAKE DEBORAH TRIB.
Built 1954
SPANISH CREEK RD over LONG BRANCH
Built 2019
OKEEFENOKEE PKWY over CLAY BRANCH
Built 2007
Bridge Details
- Structure #
- 000000004900230
- Year Built
- 1955
- Length
- 118.9 m (390.1 ft)
- Max Span
- 4.6 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,840
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,524,000
- Total Project Cost
- $2,286,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.