SPANISH CREEK RD over LONG BRANCH
4 MI SW OF FOLKSTON · County 049, Georgia · Built 2019 · 2 Lanes · 270 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.813039, -82.069367
This bridge is in worse condition than 28.2% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 7 years old.
Nearby Bridges
CR 45 over LONG BRANCH TRIB.
Built 1950
RALPH DAVIS ROAD over LONG BRANCH TRIB.
Built 2020
POST ROAD over SPANISH CREEK
Built 1960
BRYANT LANE over BRYANT SWAMP
Built 1970
POST ROAD over HATCHERS BRANCH
Built 1960
SPANISH CREEK RD over SPANISH CREEK TRIB.
Built 1950
SR 23 over CLAY BRANCH
Built 1952
PAXTON ROAD over SPANISH CREEK
Built 1950
SR 23 over SPANISH CREEK
Built 1955
CR 60 over HATCHERS BRANCH
Built 2021
Bridge Details
- Structure #
- 000000004950710
- Year Built
- 2019
- Length
- 54.9 m (180.1 ft)
- Max Span
- 18.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 270
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,984,000
- Total Project Cost
- $23,976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.