POST ROAD over SPANISH CREEK

2 MI W OF FOLKSTON · County 049, Georgia · Built 1960 · 2 Lanes · 519 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004950560
Year Built
1960
Reconstructed
2006
Length
67.1 m (220.1 ft)
Max Span
6.1 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
519
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$860,000
Total Project Cost
$1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.