POST ROAD over SPANISH CREEK
2 MI W OF FOLKSTON · County 049, Georgia · Built 1960 · 2 Lanes · 519 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.822492, -82.054856
This bridge is in worse condition than 35.2% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
CR 45 over LONG BRANCH TRIB.
Built 1950
SPANISH CREEK RD over LONG BRANCH
Built 2019
POST ROAD over HATCHERS BRANCH
Built 1960
RALPH DAVIS ROAD over LONG BRANCH TRIB.
Built 2020
CR 60 over HATCHERS BRANCH
Built 2021
SR 23 over CLAY BRANCH
Built 1952
BRYANT LANE over BRYANT SWAMP
Built 1970
SPANISH CREEK RD over SPANISH CREEK TRIB.
Built 1950
SR 23 over SPANISH CREEK
Built 1955
PAXTON ROAD over SPANISH CREEK
Built 1950
Bridge Details
- Structure #
- 000000004950560
- Year Built
- 1960
- Reconstructed
- 2006
- Length
- 67.1 m (220.1 ft)
- Max Span
- 6.1 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 519
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $860,000
- Total Project Cost
- $1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.