RALPH DAVIS ROAD over LONG BRANCH TRIB.

3 MI W OF FOLKSTON · County 049, Georgia · Built 2020 · 2 Lanes · 90 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000004950720
Year Built
2020
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,150,000
Total Project Cost
$7,725,000