CR 60 over HATCHERS BRANCH
1 MI W OF FOLKSTON · County 049, Georgia · Built 2021 · 2 Lanes · 460 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.839108, -82.035103
This bridge is in worse condition than 35.2% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 5 years old.
Nearby Bridges
POST ROAD over HATCHERS BRANCH
Built 1960
POST ROAD over CLAY BRANCH
Built 1960
OKEEFENOKEE PKWY over CLAY BRANCH
Built 2007
POST ROAD over SPANISH CREEK
Built 1960
SR 23 over CLAY BRANCH
Built 1952
US 1 / SR 4 over CLAY BRANCH
Built 1955
CR 66 over CLAY BRANCH
Built 2020
PAXTON ROAD over SPANISH CREEK
Built 1950
SR 23 over CSX RAILROAD
Built 1996
SR 4S US 1 (SBL) over CSX RAILROAD
Built 1949
Bridge Details
- Structure #
- 000000004950740
- Year Built
- 2021
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 460
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,660,000
- Total Project Cost
- $9,990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.