SR 23 over CSX RAILROAD

NE SECTION OF FOLKSTON · County 049, Georgia · Built 1996 · 2 Lanes · 2,101 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000004950600
Year Built
1996
Length
59.4 m (194.9 ft)
Max Span
23.5 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,101
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$762,000
Total Project Cost
$1,143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.