CR 66 over CLAY BRANCH

1 MI N OF FOLKSTON · County 049, Georgia · Built 2020 · 2 Lanes · 2,970 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000004950730
Year Built
2020
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,970
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,328,000
Total Project Cost
$7,992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.