POST ROAD over CLAY BRANCH
IN WESTSIDE CL FOLKSTON · County 049, Georgia · Built 1960 · 2 Lanes · 2,160 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
30.828858, -82.019597
This bridge is in worse condition than 69% of bridges in County 049. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
OKEEFENOKEE PKWY over CLAY BRANCH
Built 2007
POST ROAD over HATCHERS BRANCH
Built 1960
SR 23 over CLAY BRANCH
Built 1952
CR 60 over HATCHERS BRANCH
Built 2021
SR 23 over SPANISH CREEK
Built 1955
US 1 / SR 4 over CLAY BRANCH
Built 1955
CR 66 over CLAY BRANCH
Built 2020
POST ROAD over SPANISH CREEK
Built 1960
US 1 (SBL)/ SR 4 over LAKE DEBORAH TRIB.
Built 1954
SR 4S US 1 (SBL) over CSX RAILROAD
Built 1949
Bridge Details
- Structure #
- 000000004950580
- Year Built
- 1960
- Reconstructed
- 2006
- Length
- 18.3 m (60 ft)
- Max Span
- 6.1 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,160
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $234,000
- Total Project Cost
- $352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.