RIVERVIEW STREET over I-75 @ 167.26N
IN NW MACON · County 021, Georgia · Built 2011 · 2 Lanes · 2,210 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.8812, -83.668389
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 15 years old.
Nearby Bridges
RED OAK DRIVE over I-75 @ 167.88N
Built 1992
I-75 over I-75R TO SR247 PIERCE AV
Built 2013
NORTH PIERCE AVE. over SAVAGE BRANCH
Built 1960
I-75 over UTILITY SEWER
Built 2014
NORTHSIDE DRIVE over SABBATH CREEK
Built 1967
US 23 RIVERSIDE D over SABBATH CREEK
Built 2007
I-75 NBL AND SBL over SABBATH CREEK
Built 1965
I-75 over SAVAGE BRANCH
Built 1964
OLD HOLTON ROAD over BOWMAN BRANCH
Built 1940
PIERCE AVE SR 247 over BOWMAN BRANCH
Built 1943
Bridge Details
- Structure #
- 000000002150660
- Year Built
- 2011
- Length
- 73.8 m (242.1 ft)
- Max Span
- 25.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,210
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $946,000
- Total Project Cost
- $1,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.