US 23 RIVERSIDE D over SABBATH CREEK

NE MACON PARALLEL TO I-75 · County 021, Georgia · Built 2007 · 2 Lanes · 14,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002150530
Year Built
2007
Length
43.6 m (143 ft)
Max Span
43.6 m
Width
26.9 m (88.3 ft)
Lanes
2
Daily Traffic
14,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$559,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.