I-75 NBL AND SBL over SABBATH CREEK

0.5 MI N OF MACON · County 021, Georgia · Built 1965 · 6 Lanes · 62,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002101040
Year Built
1965
Reconstructed
2013
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
47.3 m (155.2 ft)
Lanes
6
Daily Traffic
62,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.