I-75 over SAVAGE BRANCH

IN NORTH MACON · County 021, Georgia · Built 1964 · 4 Lanes · 62,100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000002101030
Year Built
1964
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Lanes
4
Daily Traffic
62,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$181,000
Total Project Cost
$272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.