RED OAK DRIVE over I-75 @ 167.88N
0.5 MI N OF MACON · County 021, Georgia · Built 1992 · 3 Lanes · 2,820 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.888475, -83.674286
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 34 years old.
Nearby Bridges
NORTHSIDE DRIVE over SABBATH CREEK
Built 1967
US 23 RIVERSIDE D over SABBATH CREEK
Built 2007
RIVERVIEW STREET over I-75 @ 167.26N
Built 2011
I-75 NBL AND SBL over SABBATH CREEK
Built 1965
I-75 over SAVAGE BRANCH
Built 1964
MATHEWS DRIVE over SABBATH CREEK
Built 1960
I-75 over FAS 940 ARKWRIGHT ROAD
Built 2013
I-75 over I-75R TO SR247 PIERCE AV
Built 2013
NORTH PIERCE AVE. over SAVAGE BRANCH
Built 1960
FOREST HILL ROAD over SABBATH CREEK
Built 2017
Bridge Details
- Structure #
- 000000002102090
- Year Built
- 1992
- Length
- 63.4 m (208 ft)
- Max Span
- 31.7 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 3
- Daily Traffic
- 2,820
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,034,000
- Total Project Cost
- $1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.