NORTH PIERCE AVE. over SAVAGE BRANCH
0.2 MI E OF I-75 NE MACO · County 021, Georgia · Built 1960 · 2 Lanes · 800 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.874125, -83.661708
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
I-75 over I-75R TO SR247 PIERCE AV
Built 2013
I-75 over UTILITY SEWER
Built 2014
RIVERVIEW STREET over I-75 @ 167.26N
Built 2011
OLD HOLTON ROAD over BOWMAN BRANCH
Built 1940
PIERCE AVE SR 247 over BOWMAN BRANCH
Built 1943
I-75 (NBL) over NS RAILROAD
Built 1966
I-75 (SBL) over NS RAILROAD
Built 1966
RED OAK DRIVE over I-75 @ 167.88N
Built 1992
I-75 SBL over I-16 RAMP/ NS R/R
Built 2020
I-75 over I-16 RAMP/ NS R/R
Built 2022
Bridge Details
- Structure #
- 000000002150430
- Year Built
- 1960
- Reconstructed
- 2012
- Length
- 8.2 m (26.9 ft)
- Max Span
- 4 m
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $105,000
- Total Project Cost
- $158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.