I-75 SBL over I-16 RAMP/ NS R/R

IN NORTH CENTRAL MACON · County 021, Georgia · Built 2020 · 2 Lanes · 41,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000002150850
Year Built
2020
Length
151.5 m (497 ft)
Max Span
52.7 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
41,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,104,000
Total Project Cost
$66,156,000