I-75 RAMP/ I-16 EB over NORFOLK SOUTHERN R/R

IN NORTH CENTRAL MACON · County 021, Georgia · Built 2021 · 2 Lanes · 20,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002150940
Year Built
2021
Length
81.7 m (268 ft)
Max Span
33.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
20,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,828,000
Total Project Cost
$35,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.