I-75 RAMP TO I-16 over NORFOLK SOUTHERN R/R

IN NORTH CENTRAL MACON · County 021, Georgia · Built 2024 · 2 Lanes · 20,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002151180
Year Built
2024
Length
75.3 m (247 ft)
Max Span
31.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
20,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,904,000
Total Project Cost
$32,856,000