I-95 SB TR 804 over I-95 RAMP & LOCAL AVEs

ROUTE 8 SB EXIT 1 · County 001, Connecticut · Built 2002 · 1 Lanes · 23,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
03537
Year Built
2002
Length
158.8 m (521 ft)
Max Span
43 m
Width
9.7 m (31.8 ft)
Lanes
1
Daily Traffic
23,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.