INTERSTATE 95 over MYRTLE AVENUE NO. 1

150 FT S OF ROUTE 8 · County 001, Connecticut · Built 1958 · 8 Lanes · 107,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00106
Year Built
1958
Reconstructed
2000
Length
22.9 m (75.1 ft)
Max Span
21.6 m
Width
49.9 m (163.7 ft)
Lanes
8
Daily Traffic
107,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.