ROUTE 8 NB & TR 80 over I-95 S FRONTAGE RD S.AVE

I-95 EXIT 27A INTCHGNO 14 · County 001, Connecticut · Built 1999 · 3 Lanes · 41,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03535
Year Built
1999
Length
186.2 m (610.9 ft)
Max Span
57.6 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
41,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.