ROUTE 8 NORTHBOUND over WARREN ST& S FRONTAGE RD

EXIT 27A I-95 N B · County 001, Connecticut · Built 1968 · 2 Lanes · 21,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03532
Year Built
1968
Reconstructed
2022
Length
56.4 m (185 ft)
Max Span
30.5 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
21,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$5,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.