ROUTE 8 NORTHBOUND over WARREN ST& S FRONTAGE RD
EXIT 27A I-95 N B · County 001, Connecticut · Built 1968 · 2 Lanes · 21,200 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
41.171236, -73.191508
This bridge is in worse condition than 31.3% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 58 years old.
Nearby Bridges
INTERSTATE 95 over WARREN STREET
Built 1959
I-95 SB TR 805 over SOUTH AVE & WARREN ST
Built 1968
ROUTE 8 NB & TR 80 over I-95 S FRONTAGE RD S.AVE
Built 1999
I-95 NB TR 806 over S. FRONTAGE RD & LAF. ST
Built 2000
INTERSTATE 95 over LAFAYETTE STREET NO. 2
Built 1959
INTERSTATE 95 over MYRTLE AVENUE NO. 1
Built 1958
I-95 SB TR 804 over I-95 RAMP & LOCAL AVEs
Built 2002
ROUTE 8NB & TR806 over WARREN STREET
Built 1969
ROUTE 8 over PROSPECT STREET
Built 1968
ROUTE 8 SOUTHBOUND over ROUTE 8 SB RAMP 126
Built 1968
Bridge Details
- Structure #
- 03532
- Year Built
- 1968
- Reconstructed
- 2022
- Length
- 56.4 m (185 ft)
- Max Span
- 30.5 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 2
- Daily Traffic
- 21,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,500,000