I-95 NB TR 806 over S. FRONTAGE RD & LAF. ST

RAMP FROM 8 SB TO I-95 NB · County 001, Connecticut · Built 2000 · 1 Lanes · 17,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03533
Year Built
2000
Length
59.4 m (194.9 ft)
Max Span
57.3 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
17,500
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.