INTERSTATE 95 over WARREN STREET
INTERSTATE 95 EXIT 27 · County 001, Connecticut · Built 1959 · 6 Lanes · 85,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.171422, -73.191608
This bridge is in worse condition than 14.8% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 67 years old.
Nearby Bridges
I-95 SB TR 805 over SOUTH AVE & WARREN ST
Built 1968
ROUTE 8 NORTHBOUND over WARREN ST& S FRONTAGE RD
Built 1968
I-95 NB TR 806 over S. FRONTAGE RD & LAF. ST
Built 2000
ROUTE 8 NB & TR 80 over I-95 S FRONTAGE RD S.AVE
Built 1999
INTERSTATE 95 over LAFAYETTE STREET NO. 2
Built 1959
I-95 SB TR 804 over I-95 RAMP & LOCAL AVEs
Built 2002
INTERSTATE 95 over MYRTLE AVENUE NO. 1
Built 1958
ROUTE 8NB & TR806 over WARREN STREET
Built 1969
ROUTE 8 over PROSPECT STREET
Built 1968
ROUTE 8 SOUTHBOUND over ROUTE 8 SB RAMP 126
Built 1968
Bridge Details
- Structure #
- 00107
- Year Built
- 1959
- Reconstructed
- 1998
- Length
- 23.2 m (76.1 ft)
- Max Span
- 22.3 m
- Width
- 48.7 m (159.8 ft)
- Lanes
- 6
- Daily Traffic
- 85,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.