I-95 SB RAMP 305 over NORTH FRONTAGE ROAD

EXIT 27 OFF I-95 SB · County 001, Connecticut · Built 1959 · 1 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00109
Year Built
1959
Length
37.2 m (122 ft)
Max Span
34.1 m
Width
12.7 m (41.7 ft)
Lanes
1
Daily Traffic
2,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.