BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM

19.2 KM SW SAN CARLOS AZ · County 021, Arizona · Built 1928 · 2 Lanes · 390 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
00000000000H213
Year Built
1928
Reconstructed
1995
Length
53 m (173.9 ft)
Max Span
17.7 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
390
Material
Concrete
Design
Arch - Deck
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.