BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM
19.2 KM SW SAN CARLOS AZ · County 021, Arizona · Built 1928 · 2 Lanes · 390 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
33.174861, -110.526694
This bridge is in worse condition than 99.2% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 98 years old.
Nearby Bridges
BIA ROUTE 3 over COOLIDGE DAM W. SPILLWAY
Built 1928
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over SODA SPRINGS GULCH
Built 1930
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over DEEP GULCH
Built 1985
IRR BIA RTE 3 over ROCKHOUSE CANYON
Built 1929
IRR BIA RTE 3 over SANDY WASH
Built 1987
IRR BIA RTE 3 over SQUAW CANYON
Built 1929
IRR BIA RTE 3 over COTTONWOOD CANYON
Built 1929
IRR BIA RTE 3 over KELLY GULCH
Built 1929
Bridge Details
- Structure #
- 00000000000H213
- Year Built
- 1928
- Reconstructed
- 1995
- Length
- 53 m (173.9 ft)
- Max Span
- 17.7 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 390
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.