IRR BIA RTE 3 over DEEP GULCH
13.9 KM S OF AZ 70/170 · County 007, Arizona · Built 1985 · 2 Lanes · 514 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.205411, -110.510175
This bridge is in worse condition than 68% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 41 years old.
Nearby Bridges
IRR BIA RTE 3 over SANDY WASH
Built 1987
IRR BIA RTE 3 over SODA SPRINGS GULCH
Built 1930
BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM
Built 1928
BIA ROUTE 3 over COOLIDGE DAM W. SPILLWAY
Built 1928
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over ROCKHOUSE CANYON
Built 1929
IRR BIA RTE 3 over BOOT WASH
Built 1969
IRR BIA RTE 3 over SQUAW CANYON
Built 1929
IRR BIA RTE 3 over COTTONWOOD CANYON
Built 1929
Bridge Details
- Structure #
- 00000000000H166
- Year Built
- 1985
- Length
- 6.8 m (22.3 ft)
- Max Span
- 6.4 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 514
- Material
- Concrete
- Design
- Slab
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.