IRR BIA RTE 3 over GULCH
2.4 KM E OF DAM SPILLWAY · County 021, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.17125, -110.503583
This bridge is in worse condition than 68.2% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 97 years old.
Nearby Bridges
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over ROCKHOUSE CANYON
Built 1929
BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM
Built 1928
BIA ROUTE 3 over COOLIDGE DAM W. SPILLWAY
Built 1928
IRR BIA RTE 3 over SODA SPRINGS GULCH
Built 1930
IRR BIA RTE 3 over DEEP GULCH
Built 1985
IRR BIA RTE 3 over SANDY WASH
Built 1987
IRR BIA RTE 3 over SQUAW CANYON
Built 1929
IRR BIA RTE 3 over COTTONWOOD CANYON
Built 1929
IRR BIA RTE 3 over KELLY GULCH
Built 1929
Bridge Details
- Structure #
- 00000000000H168
- Year Built
- 1929
- Length
- 6.3 m (20.7 ft)
- Max Span
- 3.1 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.