BIA ROUTE 3 over COOLIDGE DAM W. SPILLWAY
19 KM SW OF SAN CARLOS AZ · County 007, Arizona · Built 1928 · 2 Lanes · 390 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
33.175278, -110.528889
This bridge is in worse condition than 91.1% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 98 years old.
Nearby Bridges
BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM
Built 1928
IRR BIA RTE 3 over SODA SPRINGS GULCH
Built 1930
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over DEEP GULCH
Built 1985
IRR BIA RTE 3 over ROCKHOUSE CANYON
Built 1929
IRR BIA RTE 3 over SANDY WASH
Built 1987
IRR BIA RTE 3 over SQUAW CANYON
Built 1929
IRR BIA RTE 3 over COTTONWOOD CANYON
Built 1929
IRR BIA RTE 3 over BOOT WASH
Built 1969
Bridge Details
- Structure #
- 00000000000H210
- Year Built
- 1928
- Reconstructed
- 1995
- Length
- 53 m (173.9 ft)
- Max Span
- 17.7 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 390
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.