IRR BIA RTE 3 over SANDY WASH
12.4 KM S OF AZ 70/170JCT · County 007, Arizona · Built 1987 · 2 Lanes · 514 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.218006, -110.507144
This bridge is in worse condition than 42.1% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 39 years old.
Nearby Bridges
IRR BIA RTE 3 over DEEP GULCH
Built 1985
IRR BIA RTE 3 over SODA SPRINGS GULCH
Built 1930
BIA ROUTE 3 over E-SPILLWAY COOLIDGE DAM
Built 1928
BIA ROUTE 3 over COOLIDGE DAM W. SPILLWAY
Built 1928
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over BOOT WASH
Built 1969
IRR BIA RTE 3 over ROCKHOUSE CANYON
Built 1929
IRR BIA RTE 3 over WASH
Built 1960
IRR BIA RTE 3 over SQUAW CANYON
Built 1929
Bridge Details
- Structure #
- 00000000000H209
- Year Built
- 1987
- Length
- 13.5 m (44.3 ft)
- Max Span
- 3.3 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 514
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.