IRR BIA RTE 3 over KELLY GULCH

15 KM E OF COOLIDGE DAM · County 009, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000000H173
Year Built
1929
Length
26.8 m (87.9 ft)
Max Span
6.7 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.