IRR BIA RTE 3 over MAVERICK GULCH

20 KM E OF COOLIDGE DAM · County 009, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000000H178
Year Built
1929
Length
13.4 m (44 ft)
Max Span
6.5 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.