2 RD NW over DOUGLAS CREEK DRAINAGE
1.13 E JCT US 2 · County 017, Washington · Built 1965 · 2 Lanes · 41 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.641767, -120.019169
This bridge is in worse condition than 10% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
AIRPORT RD (3 NW) over DOUGLAS CREEK DRAINAGE
Built 1949
US 2 over DOUGLAS CR
Built 1974
RD 3 SW over DOUGLAS CREEK
Built 1961
LAMOINE RD over DOUGLAS CREEK DRAINAGE
Built 1995
US 2 over PINE CANYON & CREEK
Built 1949
US 97 over DRY GULCH
Built 1933
US 97 over DRIVEWAY
Built 1933
US 97ALT over ENTIAT RIVER
Built 1959
US 97 over PINE CANYON CREEK
Built 1959
Bridge Details
- Structure #
- 083382000000000
- Year Built
- 1965
- Reconstructed
- 2017
- Length
- 7 m (23 ft)
- Max Span
- 6.4 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 41
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $142,000
- Total Project Cost
- $284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.