US 97 over PINE CANYON CREEK

0.1 N JCT US 97 SPUR · County 017, Washington · Built 1959 · 2 Lanes · 6,105 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0006105A0000000
Year Built
1959
Reconstructed
1983
Length
40.8 m (133.9 ft)
Max Span
15.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
6,105
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,210,000
Total Project Cost
$2,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.