AIRPORT RD (3 NW) over DOUGLAS CREEK DRAINAGE
2.7 E RD O NW · County 017, Washington · Built 1949 · 2 Lanes · 220 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.656342, -120.026853
This bridge is in worse condition than 72.5% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 77 years old.
Nearby Bridges
2 RD NW over DOUGLAS CREEK DRAINAGE
Built 1965
US 2 over DOUGLAS CR
Built 1974
RD 3 SW over DOUGLAS CREEK
Built 1961
LAMOINE RD over DOUGLAS CREEK DRAINAGE
Built 1995
US 97 over DRY GULCH
Built 1933
US 2 over PINE CANYON & CREEK
Built 1949
US 97 over DRIVEWAY
Built 1933
US 97ALT over ENTIAT RIVER
Built 1959
US 97 over PINE CANYON CREEK
Built 1959
Bridge Details
- Structure #
- 081644000000000
- Year Built
- 1949
- Reconstructed
- 1981
- Length
- 7.4 m (24.3 ft)
- Max Span
- 6.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 220
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $619,000
- Total Project Cost
- $1,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.