US 2 over DOUGLAS CR
14.1 E JCT US 97 · County 017, Washington · Built 1974 · 2 Lanes · 773 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.620792, -120.003675
This bridge is in worse condition than 87.5% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 52 years old.
Nearby Bridges
2 RD NW over DOUGLAS CREEK DRAINAGE
Built 1965
AIRPORT RD (3 NW) over DOUGLAS CREEK DRAINAGE
Built 1949
RD 3 SW over DOUGLAS CREEK
Built 1961
LAMOINE RD over DOUGLAS CREEK DRAINAGE
Built 1995
RD 4 SW over Douglas Creek Drainage
Built 2009
US 2 over PINE CANYON & CREEK
Built 1949
US 97 over DRY GULCH
Built 1933
Bridge Details
- Structure #
- 0009740A0000000
- Year Built
- 1974
- Length
- 25.3 m (83 ft)
- Max Span
- 9.3 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 773
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $670,000
- Total Project Cost
- $1,340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.