US 97 over DRY GULCH
3.9 N JCT US 97 SPUR · County 017, Washington · Built 1933 · 2 Lanes · 5,738 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.677514, -120.197444
This bridge is in worse condition than 10% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 93 years old.
Nearby Bridges
US 97ALT over ENTIAT RIVER
Built 1959
US 97 over DRIVEWAY
Built 1933
US 2 over PINE CANYON & CREEK
Built 1949
US 97 over PINE CANYON CREEK
Built 1959
ENTIAT RIVER ROAD over ENTIAT RIVER
Built 1941
ENTIAT RIVER ROAD over ENTIAT RIVER
Built 1974
CO RD 47670 over ENTIAT RIVER
Built 1921
ROARING CREEK ROAD over ENTIAT RIVER
Built 1986
AIRPORT RD (3 NW) over DOUGLAS CREEK DRAINAGE
Built 1949
2 RD NW over DOUGLAS CREEK DRAINAGE
Built 1965
Bridge Details
- Structure #
- 0001743A0000000
- Year Built
- 1933
- Reconstructed
- 1988
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 5,738
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $409,000
- Total Project Cost
- $818,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.